Qwerfjkl (bot) (talk | contribs) |
Bubirkullaniciadi (talk | contribs) m Changed some errors in the translation, I am relatively new to the Wiki system but am able to translate fairly accurately, please reach out to me if you think i've made a structural error. Tag: Visual edit |
||
Line 11: | Line 11: | ||
As of May 23, 2022, the services on the newly launched line utilize the [[TCDD E32000|E 32000 series trains]], which are also employed on the Marmaray line. These trains are configured with five cars each. |
As of May 23, 2022, the services on the newly launched line utilize the [[TCDD E32000|E 32000 series trains]], which are also employed on the Marmaray line. These trains are configured with five cars each. |
||
As of May 23, 2022, the line was initially operational only between Halkalı and Bahçeşehir stations. On January 29, 2024, the Ispartakule station became operational. The Konut Birlik station is in the final stages of its construction, while the Altınşehir station is still in its initial phase.In the future, it is anticipated that the necessary installations for these stations will be completed, making them ready for operation. |
As of May 23, 2022, the line was initially operational only between Halkalı and Bahçeşehir stations. On January 29, 2024, the Ispartakule station became operational. The Konut Birlik station is in the final stages of its construction, while the Altınşehir station is still in its initial phase. In the future, it is anticipated that the necessary installations for these stations will be completed, making them ready for operation. |
||
== İşletme bilgileri == |
== İşletme bilgileri == |
||
* ''' |
* '''Schedule of trips''': Two reciprocal trips are made every day.<ref name="Halkalı-Bahçeşehir">{{Cite web |title=Halkalı- Bahçeşehir Arasında Banliyö Tren Seferleri Başladı |url=https://www.tcddtasimacilik.gov.tr/haber/760/ |archive-url=https://web.archive.org/web/20220608223338/https://www.tcddtasimacilik.gov.tr/haber/760/ |archive-date=8 Haziran 2022 |access-date=23 Mayıs 2022 |website=[[TCDD Taşımacılık]]}}</ref> |
||
{| class="wikitable" style="margin:auto; text-align:center;" |
{| class="wikitable" style="margin:auto; text-align:center;" |
Revision as of 13:10, 2 March 2024
Halkalı-Bahçeşehir Rail System or B2 (Halkalı-Bahçeşehir) Suburban Train, is a suburban train system that operates between Halkalı Railway Station and Bahçeşehir Railway Station in İstanbul
Following the demands for the extension of Marmaray's westward terminal station, Halkalı, to Ispartakule and Çatalca, in 2019, the Municipality of Başakşehir announced that it would open a temporary train line to connect the residents of the region to Halkalı. Due to the single track between Halkalı and Bahçeşehir and the absence of a signaling system, the system can only operate with a transfer to the Marmaray line twice a day in each direction.[1]
While the construction of Bahçeşehir Station was undertaken by the Municipality of Başakşehir, the construction of Ispartakule, Altınşehir, and Konut Birlik stations were constructed by the Turkish State Railways.
After the completion of the construction of the terminal station in Bahçeşehir, on September 18, 2021, Mayor Yasin Kartoğlu of Başakşehir announced the successful completion of the first trial run of the line.
As of May 23, 2022, the services on the newly launched line utilize the E 32000 series trains, which are also employed on the Marmaray line. These trains are configured with five cars each.
As of May 23, 2022, the line was initially operational only between Halkalı and Bahçeşehir stations. On January 29, 2024, the Ispartakule station became operational. The Konut Birlik station is in the final stages of its construction, while the Altınşehir station is still in its initial phase. In the future, it is anticipated that the necessary installations for these stations will be completed, making them ready for operation.
İşletme bilgileri
- Schedule of trips: Two reciprocal trips are made every day.[2]
Halkalı (Departure) | Bahçeşehir (Arrival) | Travel Duration |
---|---|---|
06.30 | 06.52 | 22 minutes |
19.00 | 19.22 | 22 minutes |
Bahçeşehir (Departure) | Halkalı (Arrival) | Travel Duration |
07.00 | 07.22 | 22 minutes |
19.30 | 19.52 | 22 minutes |
- Track Owner(s): Turkish State Railways
- Operator: Turkish State Railways Transportation
- Track length: 1,350 kilometres (840 mi)
- Electrification: 25 kV AA Katener
Order | Station | District | Transfer(s) | Type | Notes |
---|---|---|---|---|---|
1 | Halkalı | Küçükçekmece | Add→{{rail-interchange}}・Add→{{rail-interchange}}・ (Halkalı)・・・ (Halkalı) | Level | Has:
|
↓↓ Under construction↓↓ | |||||
2 | Konut Birlik | Küçükçekmece | Level | ||
3 | Altınşehir | ||||
↑↑ Under construction ↑↑ | |||||
4 | Ispartakule | Başakşehir | Add→{{rail-interchange}} (Ispartakule) | Level | Bahçeşehir Gölet |
5 | Bahçeşehir |
|
Station distances
Measurements have been taken based on the middle section of the platforms of the stations[3]
Order | Station | Distances between stations | Distance from the initial station | Sirkeci Garı'na olan uzaklık |
---|---|---|---|---|
1 | Halkalı | 0+00 km | Departure | 27+63 km |
2 | Konut Birlik | 2+14 km | 2+14 km | 29+77 km |
3 | Altınşehir | 2+66 km | 4+80 km | 32+43 km |
4 | Ispartakule | 5+59 km | 10+39 km | 38+02 km |
5 | Bahçeşehir | 2+96 km | 13+35 km | 40+98 km |
- ^ "Bahçeşehir'den Halkalı Marmaray'a "RİNG TREN" seferi talebinde MUTLU GELİŞME…". 30 November 2019. Archived from the original on 8 May 2021. Retrieved 31 December 2021.
- ^ "Halkalı- Bahçeşehir Arasında Banliyö Tren Seferleri Başladı". TCDD Taşımacılık. Archived from the original on 8 Haziran 2022. Retrieved 23 Mayıs 2022.
{{cite web}}
: Check date values in:|access-date=
and|archive-date=
(help) - ^ "Bahçeşehir'den Halkalı'ya tren hattı UKOME'den onay aldı". 18 Ekim 2021. Archived from the original on 28 Ekim 2021. Retrieved 21 Ağustos 2022.
{{cite news}}
: Check date values in:|access-date=
,|date=
, and|archive-date=
(help)