![File:DOE-national-transmission-needs-draft-interregional-transfer-capacity-value-map.jpg](http://upload.wikimedia.org/wikipedia/en/thumb/3/35/DOE-national-transmission-needs-draft-interregional-transfer-capacity-value-map.jpg/800px-DOE-national-transmission-needs-draft-interregional-transfer-capacity-value-map.jpg?20231113013543)
Size of this preview: 800 × 299 pixels. Other resolutions: 320 × 120 pixels | 640 × 239 pixels | 1,962 × 734 pixels.
Original file (1,962 × 734 pixels, file size: 98 KB, MIME type: image/jpeg)
Summary
Map of the 2021 Average $/MWh Value of interregional Price Differences; united states electrical transmission needs. Caption: "The highest value of new transmission is acros sthe three electrical interconnections and during extreme weather events."
From the Draft 2023 national Transmission Needs Study
Source: US Department of Energy Grid Deployment Office; https://www.energy.gov/sites/default/files/2023-05/Draft-2023-National-Transmission-Needs-Study-Fact-Sheet_April-2023.pdf
Licensing
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 01:35, 13 November 2023 | ![]() | 1,962 × 734 (98 KB) | Anon423 (talk | contribs) | Map of the 2021 Average $/MWh Value of interregional Price Differences; united states electrical transmission needs. Caption: "The highest value of new transmission is acros sthe three electrical interconnections and during extreme weather events." From the Draft 2023 national Transmission Needs Study Source: US Department of Energy Grid Deployment Office; https://www.energy.gov/sites/default/files/2023-05/Draft-2023-National-Transmission-Needs-Study-Fact-Sheet_April-2023.pdf |
You cannot overwrite this file.
File usage
The following pages on the English Wikipedia use this file (pages on other projects are not listed):